xxxx国产,午夜婷婷官网,国产精品18久久久久久白浆色欲,男女无遮挡XX00动态图120秒

For home ★ Join collectio Chinese English
Home News About us Installation branch Pressure testing branch Lining repairing branch Crossing department International branch Inland branch Department Customer opinion
News
Corporate Culture
Engineering Information
Notice
Career Center
 
You now:Home > English > News > Engineering Information
Saudi Agriculture Ministry Purified water pipeline project nearing completion
      We signed the water purification, water pipelines and pressure testing service contract with the Saudi Agriculture Ministry in January 2013.
      This project is a new water pipeline from khobar to Hassa irrigation diction. The total length is 184km.the water pipeline started at Kuba city sewage treatment plant, Hofuf Hasa city irrigation district is the terminal. .Most highway route, and more construction in Hasa City roadway, due to the permission factors, operating with very small, underground complex obstacles, many surrounding buildings, along with complex geological conditions, both stonework segment, there are sands and desert sections segment, individual regional groundwater level is high, it has a greater negative impact on the production and construction.
      We had repeated communications with the owner since we entered the site, to develop a reasonable program of pressure test, pressure test to ensure the smooth operations. During the construction process, the company keeps “the site is market" management philosophy, from scratch, on-site sanitation, equipment furnishings rationalization. The company "internationalization" of the development of guidelines for field staff optimized combination of components to China three staff for technical guidance, India and Pakistan for the pressure test team personnel body construction, foreign employees on-site technical training, fast pressure test carried out post-project has laid a solid foundation. The company's pressure test work, praise the owners and supervision.
      This Projects will be successfully completed, this is a larger caliber municipal pipeline project after the Saudi SWCC project pipeline pressure test we work for . we will keep to actively promote the company's technology for more benefits to make more contributions.
Jobsite
Pre-shift Meeting
Equipment testing

Previous: Crossing Company Creates a New Record
Next: Ningxia Petrochemical outer transmissiom refined

  
About us /  Customer service / Contact us Copyright ? 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP備05002509號(hào)