xxxx国产,午夜婷婷官网,国产精品18久久久久久白浆色欲,男女无遮挡XX00动态图120秒

For home ★ Join collectio Chinese English
Home News About us Installation branch Pressure testing branch Lining repairing branch Crossing department International branch Inland branch Department Customer opinion
News
Corporate Culture
Engineering Information
Notice
Career Center
 
You now:Home > English > News > Engineering Information
South-to-North Gas transmission Cross Yellow River beach Project
DongMing Cross Yellow River beach Project includes South-to-North Gas transmission Yellow River beach HDD Crossing Project:
Pipeline Specification: Φ355.6×7.92mm, LSAW (Longitudinally Submerged Arc Welding)
Crossing Distance: 1857m
And Modification of Cross-Yellow River section of ZhongYuan-Kaifeng gas transmission pipeline:
Pipeline Specification: Ф711×17.84
Design pressure: 8MPa
Crossing Distance: 1829.61m

A series of difficulties was encountered at early stage of the project, such as long crossing distance, steering control, complicated geological conditions; it was solved under proper organization of PM wang yanmin, lai yongbin, zhang chunjing and cooperation of all team members (Jia yongfang, chen yongliang, jia yongzhen, wang weiliang, ji shigui etc). Pull-back of South-to-North Gas transmission Yellow River beach HDD Crossing and Modification of Cross-Yellow River section of ZhongYuan-Kaifeng gas transmission pipeline was completed on March 28 and April 30 respectively.


Previous: Jordan Pipeline Rehabilitation Project
Next: Praise from Client of Beijing Water Group

  
About us /  Customer service / Contact us Copyright ? 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP備05002509號(hào)